Lithium X2 Files Pre-Feasibility Study Technical Report for High-Grade Nevada North Lithium Project; Confirms Strong Economics
Lithium X2 Mining Inc. (formerly Surge Battery Metals Inc.) announces it has filed an independent National Instrument 43-101 Technical Report for its 2026 Pre-Feasibility Study for the Nevada North Lithium Project located in Elko County, north of Wells, Nevada. The Technical…
